
Full water supply pipe replacement in Kelvedon Hatch, completed using trenchless moling to protect a newly installed resin driveway and solid concrete internal floors. A new 25 mm MDPE supply was installed with an INSUDuct entry system and full reinstatement.

Site survey & recommendation
Installation & access
All excavations were backfilled in layers and mechanically compacted to prevent future settlement. The resin driveway, turf, grass, and block edging were fully reinstated to their original appearance.
The new MDPE supply was pressure-tested, chlorinated, and commissioned, providing the homeowner with a durable, regulation-compliant water line. A Compliance Certificate was issued to both the homeowner and the local water authority, confirming full adherence to UK Water Regulations.

